03
04
Location:
首页>application area>Hotels
Back to list

Hotels

  • Project introduction:Water supply time: 24-hour irregular water supply; Water return system: regular temperature control water return, requiring 3-7 seconds of hot water; Daily hot water consumption: 150-200u/room; 300u dissolving tank; Operation time of the unit: 8-10 hours under the coldest working condition above
contact us

Guangdong GEME Refrigeration Equipment Co., Ltd. Yue ICP Bei No. 19056255